null
30 people viewed this product recently

Tremie Pipe Diameter, 8in Diameter x 4ft Length

Price $149.50
upsell:
/tremie-collar-8-diameter/
upsell:
/tremie-trunk-8-diameter/
upsell:
/tremie-hopper/
Condition:
New
Minimum Purchase:
1 unit
SKU:
V009.TRE-PIPE-8

We Accept

  • PayPal
  • Visa
  • MasterCard
  • Discover
  • American Express
Est. ship in 1-2 weeks | Ships oversized
* Estimate is for US customers only.
* Shipping and Import Duties are calculated at checkout.
See Product Information
Fast Shipping

Fast
Shipping

Simple Ordering

Quick,
Simple Ordering

Upfront Pricing

Clear,
Upfront Pricing

Happy Customer

Over 30,000
Happy Customers

Customer Service

Exceptional
Customer Service

Largest Catalog

Industry's Largest
Catalog

Tremie Pipe for Underwater Concrete Pouring, 8-inch Diameter

This heavy-duty Tremie Pipe is engineered for placing concrete underwater efficiently and safely. With thick polyethylene walls and robust steel chains and brackets, this pipe is built for extra-long life on demanding construction sites.

Product Specifications:

  • Diameter: 8 inches
  • Length: 4 feet (can be connected in sections for greater depth)
  • Material: High-density Polyethylene
  • Fittings: Heavy-duty steel chains and brackets
  • Origin: Made in the USA
  • Also Available: 12” diameter x 4 ft sections

In-Depth Product Description

The Tremie Method Explained The tremie concrete placement method is a specialized technique used to pour concrete below the water level or into deep forms where there's a risk of segregation (separation of aggregates, sand, and cement) or contamination. The process involves using a vertical pipe, the "tremie," to deliver fresh concrete directly to the placement point, displacing the water without mixing with it.

Our system, featuring the Tremie Conical Hopper, is a complete solution for this critical construction task.

1. The Tremie Conical Hopper The process begins with the Tremie Conical Hopper. Made from durable, high-quality polyethylene, this funnel-shaped hopper acts as a reservoir at the top of the pipe assembly. Its wide mouth allows for efficient batch loading, while the narrow bottom ensures a smooth, continuous, and controlled flow of concrete into the tremie pipe.

2. The Tremie Pipe Sections The concrete flows from the hopper into the tremie pipe sections. These pipes are placed vertically, with the bottom end positioned at the pour location. The key to a successful tremie pour is to keep the discharge end of the pipe embedded within the freshly placed concrete at all times after the initial pour. This creates a seal that prevents water from entering and contaminating the mix. As the concrete level rises, pipe sections are removed one by one, ensuring the discharge point remains submerged in the concrete.

Key Advantages of Using Our Tremie System:

  • Prevents Water Contamination: The hopper and pipe system maintains positive pressure at the discharge point, pushing water out of the way rather than allowing it to mix with the concrete. This is crucial for achieving the designed strength and durability of the underwater structure.
  • Reduces Segregation: By delivering concrete directly to its final position without a significant free fall, the tremie method minimizes the risk of segregation. This ensures a consistent, high-quality, and homogeneous concrete structure.
  • Precise Placement: The design allows for pinpoint accuracy when placing concrete in deep foundations, caissons, bridge piers, and other submerged or confined structures. This control is essential for maintaining the structural integrity of the final product.

In summary, the Deslauriers Tremie Hopper and Pipe system is an indispensable tool for modern construction. It facilitates a controlled, efficient, and precise concrete pour, ensuring the successful execution of complex projects and the superior quality of the resulting concrete structures.


System Components and Best Practices

Essential Components:

  • Conical Hopper: Ensures a steady, continuous flow of concrete into the pipe.
  • Tremie Pipe Sections: Thick-walled polyethylene sections (8" or 12" diameter) that connect to reach the desired depth.
  • O-Ring Seals: Create a watertight seal between pipe sections, preventing leakage and water ingress.
  • Lifting Cap and Suspension Jig: Allows for easy and safe handling, placement, and removal of pipe sections with a crane.
  • Foam Rubber "Pig" or Plug: Used at the beginning of the pour to seal the bottom of the pipe, separating the initial charge of concrete from the water below it. It is pushed out as the pour commences.

Applications:

  • Underwater Foundations: Essential for bridge piers, offshore platforms, and intake structures.
  • Deep Foundations: Used for constructing diaphragm walls, slurry walls, and bored piles.
  • Complex Subterranean Structures: Ideal for tunnels, subway stations, and other projects with limited access.
  • Marine Construction: Perfect for building seawalls, breakwaters, and other coastal or offshore structures.

Safety and Best Practices for a Successful Pour:

  1. Initial Setup: Ensure the tremie pipe is securely sealed and positioned correctly. Use the foam plug at the bottom to create the initial separation from water.
  2. Continuous Flow: The pour must be continuous. Introduce each new batch of concrete quickly to maintain a constant flow and prevent the concrete from setting prematurely within the pipe.
  3. Maintain the Seal: The most critical rule of tremie pouring is to keep the discharge end of the pipe embedded at least 3-5 feet into the freshly placed concrete at all times. This prevents water from entering the pour zone.
  4. Manage Pipe Sections: As the concrete level rises, tremie pipe sections must be removed. This should be done quickly and carefully to minimize interruption to the flow and to ensure the pipe end remains submerged.
  5. Avoid Disturbance: Do not vibrate or excessively disturb freshly placed tremie concrete, as this can cause segregation and weaken the structure.
  6. Equipment Maintenance: Regularly inspect all pipes, seals, and hoppers to ensure they are free of blockages, damage, or old concrete to prevent interruptions and ensure a safe, efficient operation