Fast
Shipping
Quick,
Simple Ordering
Clear,
Upfront Pricing
Over 30,000
Happy Customers
Exceptional
Customer Service
Industry's Largest
Catalog
6-Foot Replacement Trunk for Mini Tremie Hopper
This is a 6-foot replacement elephant trunk specifically designed for the Mini Tremie Hopper. It features a seamless, one-piece construction with an 8" diameter and weighs 6 lbs. The trunk's integrated flange ensures a secure and easy attachment to the hopper. Proudly made in the USA.
About the Mini Tremie Hopper System
The Mini Tremie Hopper is an essential tool for precise concrete pouring, especially in confined spaces or areas with limited access. It is specifically designed to facilitate the tremie method, which ensures controlled and efficient concrete placement from the bottom up, minimizing segregation and air entrapment in challenging construction scenarios.
Constructed from high-quality, durable materials, the Mini Tremie Hopper is built to withstand rigorous construction site conditions while remaining lightweight and portable. Its compact size allows for easy maneuverability in tight spaces, making it the ideal solution for applications where larger concrete pumps or equipment are impractical.
How It Works
During concrete placement, the Mini Tremie Hopper is positioned over the target area. Concrete is loaded into the hopper, which acts as a reservoir, providing a steady, uninterrupted flow through the attached elephant trunk. The narrow 8" diameter of the trunk directs the concrete precisely to the desired location, preventing segregation and ensuring a uniform, high-quality pour.
Key Applications
The Mini Tremie Hopper excels in a variety of applications, including:
- Small-scale foundations and footings
- Pouring floor slabs in tight areas
- Constructing retaining walls
- Concrete repairs in congested urban environments
- Filling block walls or narrow forms
By using the Mini Tremie Hopper, construction professionals can achieve superior concrete quality and structural integrity even in the most challenging environments. The controlled flow minimizes waste, reduces the risk of voids, and improves overall construction efficiency.